FLYING CUBE / BRAZZAVILLE 2015

  fleche-backfleche-next
CHOICE OF A RIGGING SOLUTION FOR 11th AFRICAN GAMES CLOSING CEREMONY

Concept, Show design & Direction : Martin ARNAUD – LES PETITS FRANCAISS
Production : LIVE ! GL EVENTS
Cube design : CATS ENGINEERING / Rigging  : SCENE CONCEPT  and FL STRUCTURES

For African Games Closing ceremony 2015, in answer to the idea of director Martin ARNAUD, and in association with CATS Engineering, we at BE 2 PROD estimated the preliminary budget to have a flying cube with 12 m edge in the middle of Kintele stadium

BE 2 PROD SCOPE OF WORK

Preliminary budget estimation / Presentation of rig concept to production team / Supplier sourcing